Millbridge Flood – Waxhaw
AWCK prepared the HEC-2 analysis and CLOMR application for the construction of a bridge, floodplain development, and relocation of the floodway along Twelve Mile Creek in the Town of Waxhaw for Sandler at Kensington, LLC. A CLOMR was issued in October of 2008.
Project Manager: G. Wesley Webb, P.E.