Cobblebrook Creek LOMR – Burlington
The City of Burlington contracted with AWCK to prepare a LOMR application for the submission to NC Floodplain Mapping to change the hydraulic analysis and reduce the width and the location of the floodplain along Cobblebrook Creek. A LOMR was issued in December of 2009.
Project Manager: G. Wesley Webb, P.E.