Bank Street Culvert Replacement -Granite Quarry
The existing corrugated metal pipe carrying Bank Street over Trexler Creek in Granite Quarry failed and was replaced with a 60′ long x 12′ span x 5′ rise poured in place concrete box culvert. The project included the box culvert, wingwalls, roadway improvements including widening the street, curb and gutter, sidewalk, and water and sewer improvements.
Project Manager: G. Wesley Webb, P.E.
Completion Date: 2010
Construction Cost: $192,000