Mackintosh On The Lake, West Back Creek Bridge for Bonnar Bridge Parkway – Burlington
Mackintosh LLC retained AWCK to complete a HEC-2 hydraulic analysis and prepared CLOMR and LOMR application for the construction of a new bridge, including floodway revisions, and floodplain development in Alamance County and the City of Burlington. A LOMR was issued in May of 2007.
Project Manager: G. Wesley Webb, PE