Brookwood Avenue Culvert Replacement -Granite Quarry

The Town of Granite Quarry’s Brookwood Avenue Culvert Replacement consisted of replacing a 48″ CMP pipe that had failed with a 70′ long x 12′ span x 8′ rise precast concrete box culvert to reduce up-stream flooding.  The project included the installation of the box culvert and wingwalls, roadway, curb and gutter, storm drainage, sidewalk, and water and sewer relocation.

Project Manager: G. Wesley Webb, P.E.
Completion Date: 2011
Construction Cost: $300,000