US Highway 70—30” Waterline Improvements

AWCK provided construction drawings, specifications and bid documents for the replacement of a 30″ RCP water main in Graham. The project consisted of installing approximately 3,900 LF of 30″ DIP waterline from the Graham Water Plant to Water Plant Road on Highway 70. Project construction began in March 2001 and was completed in August 2001. The project assisted with the transport of domestic water to customers after the capacity of the water treatment plant was doubled to 12.0 MGD.


Project Contact: Mr. Chris Rollins (previously Graham City Manager)
Assistant City Manager
City of Mebane
(919)563-5901

Project Manager & Project Project Engineer: Mark Averette, P.E.
Completion Date: 2001

Graham-hwy70Water3