Village of Alamance—Secondary Water Main Connection

AWCK provided construction drawings, specifications and bid documents for approximately 7,800 LF of 8″ water main to provide the Village of Alamance with a secondary domestic water connection to Burlington’s public water distribution system. The project was designed to provide a second domestic water source to the Village of Alamance in the event that the primary source should require a shutdown for repair or maintenance. The second water source also provides additional pressure surrounding the points of connection.


Project Contact: Cathera Bundren, Mayor
Village of Alamance
(336)226-0033

Project Manager & Project Engineer: Mark Reich, P.E.
Assistant Project Engineer: Kyle Smith, P.E.
Project Completion: 2010