City of Graham – Water System Enhancement Projects
AWCK provided construction drawings, specifications and bid documents for approximately 5,000 LF of 6″ and 8″ water mains throughout Graham in 2009. The water line extension projects were designed to improve residual water pressures, eliminate dead end lines, replace aging infrastructure and provide fire protection to residential areas where none was previously available. Water main were replaced on seven city streets.
Project Contact: Mr. Chris Rollins (previously Graham City Manager)
Assistant City Manager
City of Mebane
(919)563-5901
AWCK Contact: Franz Holt, P.E.
Completion Date: 2009