Dale Earnhardt Blvd Sidewalk Project- Kannapolis

The City of Kannapolis received FHWA Congestion Mitigation and Air Quality Improvement (CMAQ) funds through the Cabarrus Rowan Metropolitan Planning Organization to construct sidewalk along NC Hwy 3 (Dale Earnhardt Blvd) in Kannapolis, NC. This project provides pedestrian connectivity to shopping centers and residential neighborhoods along Dale Earnhardt Blvd. The City of Kannapolis selected AWCK to provide design and contract administration and inspection (CEI) for the project. AWCK worked with NCDOT and FHWA to provide this service to the City of Kannapolis for their reimbursement from NCDOT for the Federal Funds. The project included storm drainage, sidewalk, grading, retaining walls, pedestrian hand rails, pedestrian refuge island, and restriping of crosswalks.

Design Engineer: Jeff Moody, PE
CEI Engineer: David Lipe, PE
Completion: 2014