NC Hwy 65 Sidewalk Improvements (TIP C-4978) – Rural Hall
A Congestion Mitigation grant awarded through NCDOT to the Town of Rural Hall partially funded the installation of 3,300 linear feet of concrete sidewalk along NC Hwy 65. The project included sidewalk and associated storm drainage. AWCK provided design, bidding, contract administration and inspection on this project. Contract administration and inspection services on this project were completed in accordance with current NCDOT guidelines.
Project Engineer: David Lipe, PE
Completion: 2009
Construction Cost: $110,000