The Town of Rural Hall was awarded an ARRA Stimulus Grant to construct 3,500 linear feet of concrete sidewalk along NC Hwy 66 and 450 linear feet of curb and gutter and sidewalk along Park Street. The project included sidewalk and associated storm drainage. AWCK provided design, bidding, contract administration and inspection on this project. Contract administration and inspection services on this project were completed in accordance with current NCDOT guidelines.
Project Manager: David Lipe, PE
Completion: 2010
Construction Cost: $150,000