Primary Pump Station & Force Main – Haw River

AWCK provided construction drawings, specifications and bid documents, and construction related services for replacement of the Town’s Primary Pump Station on the edge of the Haw River. The project consisted of relocating the existing pump station out of the 100 year floodplain (and beyond the 500 year floodplain as well), building a new pump station for the 1.2 MGD station installing 2,500 GPM pumps and providing standby power to the pump station. AWCK also worked with several permitting agencies and the USDA to coordinate funding. The replacement pump station has also reduced the possibility of sanitary sewer overflows and was completed in 2012.


Project Contact:Burlington, NC - January 12, 2012 - Architects and engineering staff at Alley, Williams , Carmen and King photographed on job sites and at their main office. (Photography by Steve Exum, www.exumphoto.com)
Mr. Jeff Earp, Town Manager
Town of Haw River

Project Manager: Darrell Russell, PE
Project Engineer:    Mark Averette, PE
Completion:        2012
Construction Cost: $1.2 Million

 

 

Wet WellScreen