Engineering Projects | Water Distribution

Town of Gibsonville – NC 61 North 12” Watermain Connector

AWCK was selected to preform survey, engineering design, easement mapping and construction observation and contract administration for the installation of a 12” watermain that would span approximately 8,000 linear feet and connect to developer installed 12” watermain. The design of this watermain included the crossing of two streams, a 10” gas main, a high voltage power easement, and running parallel to a large communication conduit. During the planning phase of this project the engineering team considered several routes and decided to traverse across Town rather than opting for a route in a less developed location. While this choice did involve the design complexities mentioned above, alternate routes would have provided less benefit to the existing water system and an increased material cost to the Town. The project was completed in August of 2024, ahead of schedule and under the project budget.

Project Team:

Josh Johnson, P.E. – Principal In Charge
Clay Phillips, P.E. – Project Engineer
Heath Williams, P.L.S. – Survey Manager
Wally Fox – Civil Design Technician
Jon Pendergraph – Construction Observation/Administration

Completion: 2024