Church Street Sidewalk Improvements (TIP U-4741 MC, B, and J) – Rural Hall

As part of their Bicycle and Pedestrian Facilities Plan, the Town of Rural Hall made sidewalk improvements along Church Street, Bellemeade and Paso Street a priority.   This project included the installation of 3,500 linear feet of curb and gutter and concrete sidewalk.  This project was funded with Direct Attributable funding through NCDOT.  The project included sidewalk, retaining walls, fencing, curb and gutter, and associated storm drainage.  AWCK provided design, bidding, contract administration and inspection on this project. Contract administration and inspection services were provided on this project in accordance with current NCDOT guidelines.

Project Engineer:    David Lipe, PE
Completion:        2011
Construction Cost:    $440,000