Master Meter Project – Gibsonville

The new meter was installed to provide an additional connection to the City of Burlington’s water system.  Prior to the meter installation, Gibsonville had only one metered connection to Burlington, an emergency connection to the Town of Elon and an emergency connection to the City of Burlington.  Gibsonville connected an 8” water line to Burlington’s 24” water line at the new meter.

Project Engineer:    Mark Averette, PE
Completion:        2009