Kannapolis Fire Station No. 5
AWCK prepared plans for the initial phase of construction which included the installation of off-site utilities to the facility including pre-grading of the site, and roadway widening and sidewalks along Barr Road. AWCK also collaborated with an outside architectural firm to provide the civil/site design for the facility including survey, site engineering, parking lot layouts, storm drainage and landscaping.
Project Manager: Jeffery D. Moody, P.E.
Completion: 2008
Site & Utility Construction Cost: $720,000