Village of Clemmons Pavement Condition Survey
The Village of Clemmons selected AWCK to perform a pavement condition survey on their streets in 2015. The Village has used the rating to prioritize their resurfacing and street maintenance actives of their approximate 80 miles of streets.
AWCK used the PCR 100 point rating system whereby each street begins with a rating of 100 and deductions are made based on various pavement distresses. The report included maintenance recommendations for streets based on the distresses of each street.
Project Engineer: David Lipe, PE
Completion: 2015