Cobblebrook Creek LOMR – Burlington

The City of Burlington contracted with AWCK to prepare a LOMR application for the submission to NC Floodplain Mapping to change the hydraulic analysis and reduce the width and the location of the floodplain along Cobblebrook Creek.  A LOMR was issued in December of 2009.

Project Manager:  G. Wesley Webb, P.E.